IRWD-Advertises a $5,150 Million Recycled Water Pump Station

Lake Forest Zone B to C Recycled Water Pump Station

Invitation: # 11168

Bid Due Date: 08/26/2021 2:00 PM (PDT)

License Requirements: CADIR – Registered DIR Public Works Contractor

Engineering Department: 15600 Sand Canyon Ave. Irvine, California

Estimated Bid Value: $5,150,000.00

Project Duration: 420 days from the date of the Notice of Award

Bid Bond: 10.00%
Payment Bond:100.00%
Performance Bond:100.00%

Pre-Bid Meeting: No

Q&A Deadline: 08/19/2021 2:00 PM (PDT)

Contact: Joe McGehee 949-453-5542 mcgehee@irwd.com

Scope of Services: The Lake Forest Zone B to C Recycled Water Pump Station project includes, but is not limited to, the demolition of an existing horizontal split case pump station, the construction of an 1,800 square foot CMU pump station building, a CMU site perimeter screening and retaining wall, paving, mechanical piping and equipment, horizontal end-suction pumps, electrical systems and equipment, controls systems and equipment, HVAC systems and equipment, a surge control system, and associated piping. The project also includes installation of the SMWD interconnect facilities which includes, but is not limited to, demolition of existing PVC pipeline, installation of electrical and instrumentation systems, installation of ductile iron pipe and fittings, magnetic flow meter, and valves within a concrete vault

IRWD Construction Manual (Standard Drawings and Technical Specifications) available for download at www.irwd.com (See “Doing Business” and “Engineering”)

Hard copy plans and specs are available: Contact Kristen KLD@sabp.com