Skip to main content

Irvine Ranch Water District- $1,600,000 Pump Station RFP

IRWD Project-  IIC East Zone A to B Recycled Water Pump Station Upgrades Project

Project Number: PR 06198, Code 7044

Project Manager: Joe McGehee, IRWD, 949-453-5542
Design Engineer: Eric Lovering, Lee & Ro, 858-332-4284

Bidders: Bids will be accepted for this Project only from the prequalified bidders on the Project Bidders List. Prequalification to be placed on the Project Bidders List for this Project is closed.

Bid Opening Date: Thursday, September 27, 2018, 2:00 P.M.

Location of Opening: Irvine Ranch Water District  15600 Sand Canyon Avenue, Irvine, CA 92618

Description of Project: Upgrades to IRWD’s existing IIC East Zone A to B recycled water pump station include adding a new pump, pump motor (150 HP), piping, check valve, instrumentation, and air-relief valves, and replacement of four pump motors (150 HP), MCC including two VFD’s and three SST’s, PLC, switchgear, HVAC, 24-inch magnetic meter, 6-inch PRV, axial fan, SCE transformer, and associated appurtenances. Site work includes replacement of asphalt pavement, fencing, bollards, and removal of interfering landscaping. The pump station will be taken offline between July and August 2019 to accommodate portions of the work.

Plans/Specs Available at: SABP Print Solutions  2372 Morse Avenue, Irvine, CA 92614 (949) 756-1001 Contact Kristen at KLD@sabp.com

Time of Performance: 360 consecutive calendar days from date of mailing the Notice of Award

Engineer’s Estimate: $1,600,000 (One Million Six Hundred Thousand Dollars)

Pre-Bid Meeting: A mandatory pre-bid meeting is scheduled for Thursday, September 6,
2018 at 9:00 AM. The meeting will be held at the pump station site, located at 6747 Irvine Center Drive, Irvine. Vehicles should park at the IRWD Sand Canyon Headquarters, 15600 Sand Canyon Avenue, Irvine. Bidders may then walk to the pump station site (see map).