City of Newport Beach – New Marina Park Project

Marina Basin Construction including Dredging, Bulkheads, Grading and Soil Remediation

The work necessary for the completion of this contract includes, but not limited to, improving the underlying ground for the future construction of buildings through the use of stone columns (Vibro Displacement Stone Columns – VDSC); installing seawall/bulkhead/groin wall with dead man tie backs and fabricated handrail; dredging of the marina basin; placing and grading of the dredged and excavated materials in multiple locations; and all other items to complete work in place.

Engineer’s Estimate: $4,000,000

ONLY THE PRE-QUALIFIED  GENERAL CONTRACTORS LISTED BELOW MAY BID ON THIS CONTRACT

Mandatory Pre-Bid Meeting at 10:00 AM on Thursday, October 24, 2013, to be held at the 18TH Street  Parking Lot

Located at 1770 W. Balboa Boulevard, Newport Beach, CA 92663

Marina Blog

THE SCOPE OF WORK FOR THE ENTIRE MARINA PARK PROJECT CONSISTS OF:

Constructing a new bayfront public park with new public marina on 10.45 acres of land, including removal of mobile home park, various community buildings and recreational facilities, and construction of 23,832 sq. ft., 35-fl high multi-purpose and sailing program building with 71-ft. high architectural design feature presenting a lighthouse (non-functioning); 5,500 sq. ft. Girl Scout building; 157- space public parking area; public park amenities including new restroom with 34-ft. high lighthouse (non-functioning); and new public marina (including bulkhead and groin) consisting of 23 slips and 200-ft. long side tie area, to be partly excavated from dry land (total 681000 cu.yrds.); and tentative parcel map to combine 35 Jots into 4 1ots.