IRWD Sewer Siphon Improvements Project
Project Number: Project Number 07886
Project Manager: Alex Murphy, 949-453-5863 murphy@irwd.com
Engineer’s Estimate: $5,884,350.00
Time of Performance: 371 consecutive calendar days from date of mailing the Notice of Award
Bidders: Bids will be accepted for this Project only from the prequalified bidders on the Project Bidders List. Prequalification to be placed on the Project Bidders List for this Project is closed.
Bid Opening Date: Thursday, March 19, 2020, 2:00 PM PST (Electronic only)
Location of Opening: Irvine Ranch Water District, 15600 Sand Canyon Avenue, Irvine, CA 92618
Description of Project: The work consists of sewer siphon and sewer cleaning and CCTV, CIPP lining of sewer siphon barrels, site improvements, sewer siphon vault rehabilitation improvements, air jumper repairs, air jumper construction, construction of a chemical dosing facility, two grit traps and two odor control vents. These improvements will be constructed at four separate sewer siphon locations (S2, S4, S6, and S10) which are located in Irvine and Tustin.
Pre-Bid Conference: A mandatory pre-bid meeting is scheduled at 10:00 AM PST on Thursday, February 27, 2020 at the IRWD Michelson Operations Center, 3512 Michelson Drive, Irvine, CA 92612, followed by project site visits.
Plans/Specs Available from: SABP Print Solutions 2372 Morse Avenue, Irvine, CA 92614 (949) 756-1001
Contact Kristen at KLD@sabp.com