Irvine Ranch Water District Pipeline RFP

IRWD- Culver Drive Recycled Water Pipeline Replacement RFP

Project Number: PR 10588, Code 7035

Project Manager: Malcolm Cortez, P.E. (949) 453-5854
Project Engineer: Thomas Bonkowski (949) 453-5692
Design Engineer: Frank Cahill, P.E., RCE Consultants, Inc. (949) 453-0111

Bidders: Bids will be accepted for this Project only from the prequalified bidders on the Project Bidders List. Prequalification to be placed on the Project Bidders List for this Project is closed.

Bid Opening Date: Thursday, July 12, 2018 at 2:00 P.M.

Location of Opening: Irvine Ranch Water District, 15600 Sand Canyon Avenue, Irvine, CA 92618

Description of Project: This project will install approximately 1,180 linear feet of 12-inch PVC pipe, 30 linear feet of 8-inch PVC pipe, traffic loops, valves, two 2-inch recycled water services, one 8-inch meter in vault, abandonment of the existing 8-inch ACP recycled water pipeline, existing meter vault removal, backfill, compaction, and pavement restoration.

Plans/Specs Available at:
SABP Print Solutions
2372 Morse Avenue, Irvine, CA 92614 (949) 756-1001
Contact: Kristen  KLD@sabp.com

Time of Performance: 120 consecutive calendar days from date of mailing the Notice of Award

Engineer’s Estimate: $677,100 (Six Hundred Seventy-Seven Thousand One Hundred Dollars)

Pre-Bid Meeting: A non-mandatory pre-bid meeting will be held at 10:30 A.M. on Thursday, June 28, 2018 at the IRWD Operations Center, 3512 Michelson Drive, Irvine CA 92612

IRWD Construction Manual available for free download at www.irwd.com