IRWD releases $9,180,000 Pipeline RFP
Name of Project: Offsite Pipelines for the Irvine Lake Pipeline North Conversion
Project Number: 05823
Owner: Irvine Ranch Water District (IRWD) Engineering Department
Project Manager: Joe McGehee, 949-453-5542
Project Engineer: Bryan Kallenbaugh, Michael Baker International, 949-855-7098
Bidders: Bids will be accepted for this Project only from the prequalified bidders on the Project Bidders List. Prequalification to be placed on the Project Bidders List for this Project is closed.
Bid Opening Date: Thursday, July 13, 2017, 2:00 P.M.
Location of Opening: Irvine Ranch Water District 15600 Sand Canyon Avenue, Irvine, CA 92618
Engineer’s Estimate: $9,180,000 (Nine Million One Hundred Eighty Thousand Dollars)
Description of Project: The project includes the installation of approximately 9,800 linear feet (LF) of 42-inch recycled water pipeline, 1,400 LF of 20-inch recycled water pipeline, 73 LF of 10-inch recycled water pipeline, connections to the existing Irvine Lake Pipeline at two separate locations, connection to the existing reservoir inlet and outlet pipelines, appurtenances, pressure testing, energizing the new pipelines, backfill, pavement restoration, traffic control, erosion and sediment control, compliance with mitigation measures and coordination with the new Zone C+ Reservoir work (by others) as required.
Time of Performance: 400 consecutive calendar days from date of mailing the Notice of Award
Pre-Bid Meeting: A mandatory pre-bid conference is scheduled for Wednesday, June 14, 2017 at 10:00 AM. The meeting will be at 15600 Sand Canyon Avenue, Irvine, CA 92618.
Plans/Specs: SABP Reprographics 2372 Morse Avenue, Irvine, CA 92614 (949) 756-1001 KLD@sabp.com
IRWD Construction Manual available for free download at www.irwd.com