IRWD-Rancho Parkway Zone C Recycled Water Pipeline_Addendum

ADDENDUM_Rancho Parkway Zone C Recycled Water Pipeline

Project Number: PR 30573 (6470) Code 6602

AN ADDENDUM HAS BEEN ISSUED EXTENDING THE BID DATE TO JANUARY 26TH AT 2:00 PM 

Owner: Irvine Ranch Water District (IRWD) Engineering Department

Pages from TEMP002

Project Manager: Malcolm Cortez, (949) 453-5854
Project Engineer: Carl Spangenberg (949) 453-5567
Design Engineer: Mike Fakhar, MBF Consulting, Inc.

Bidders: Bids will be accepted for this Project only from the prequalified bidders on the Project Bidders List. Prequalification to be placed on the Project Bidders List for this Project is closed.

• ARB, Inc.
• CCL Contracting, Inc.
• E.J. Meyer Company
• Flatiron Construction Corp.
• GCI Construction, Inc.
• Kennedy Pipeline Company
• L&S Construction, Inc.
• Leatherwood Const., Inc.
• Mladen Buntich Const. Co.
• Paulus Engineering, Inc.
• PCL Construction, Inc.
• Steve P. Rados, Inc.
• J.F. Shea Construction, Inc.
• L.H. Woods & Sons, Inc.
• Steve Bubalo Construction Co.
• Sukut Construction, Inc.
• Sully-Miller Contracting Co.
• TE Roberts, Inc.
• Vido Artukovich & Son, Inc.
• W.A. Rasic Construction

Bid Opening Date and Time: Tuesday, January 26, 2016, 2:00 PM PST. Location of Opening: Irvine Ranch Water District, 15600 Sand Canyon Avenue, Irvine, CA 92618

Description of Project: The project includes all labor, materials, and equipment required to install 1,670 feet of 12-inch PVC pipe, 20 feet of 6-inch PVC pipe, main line valves, air vacuum valves, removal of existing backflow assembly and ancillary equipment, including but not limited to demolition, removal, potholing, trenching, paving repair, slurry seal, re-striping, and all other necessary work.

Time of Performance: 120 consecutive calendar days from date of mailing the Notice of Award

Engineer’s Estimate: Three hundred sixty-one thousand seven hundred sixty-five dollars($361,765)

Pre-Bid Meeting: A non-mandatory pre-bid meeting and site visit will be held on Tuesday, January 5th, 2016 at 2:00 PM, at the IRWD Operations Center located at 3512 Michelson, Irvine, CA 92612.

Plans/Specs Available at:

SABP Reprographics, 2372 Morse Avenue, Irvine, CA 92614 (949) 756-1001