IRWD Advertises a Pipeline Improvement Project in Lake Forest, CA
Name of Project: Lake Forest 16-Inch Zone C Recycled Water Pipeline in Vista Terrace & Zone B to C Pump Station Piping Improvements
Project Number: Project Number 11236 Code 7530
Project Manager: Toni Lynch – 949-453-5410 Lynch@irwd.com
Engineer’s Estimate: $670,000.00
Time of Performance: 210 consecutive calendar days from date of mailing the Notice of Award
Bid Opening Date: August 13, 2020, 2:00 PM PST (Electronic only)
Description of Project: The project consists of open cut construction of approximately 1,700 linear feet of 16-inch CMLC pipeline in Vista Terrace in the City of Lake Forest, connections to existing 12-inch and 16-inch pipelines within street right-of-way, removal of a valve in the intersection of Orchard Road and Rancho Parkway South, open cut installation of pipeline laterals to a future pump station on Lake Forest Drive, appurtenances, pressure testing, backfill, pavement restoration, traffic control, and erosion and sediment control.
Bidders: Bids will be accepted for this Project only from the prequalified bidders on the Project Bidders List (see below) Pre-qualification to be placed on the Project Bidders List for this Project is closed.
- E.J. Meyer Company
- Ferreira Construction Co., Inc.
- GCI Construction, Inc.
- GRFCO, Inc.
- Gwinco Construction & Engineering, Inc.
- Irvine Pipeline Company, Inc.
- L&S Construction, Inc.
- Leatherwood Construction, Inc.
- Mladen Buntich Construction Co.
- MNR Construction, Inc.
- Paulus Engineering, Inc.
- Steve P. Rados, Inc.
- Sukut Construction, Inc.
- Sully-Miller Contracting Company
- T.E. Roberts, Inc.
- Vido Artukovich & Son, Inc.
- W.A. Rasic Construction
Bids: The Contract Documents consist of the IRWD Construction Manual, the Project Manual, and the Plans, and may be downloaded free of charge at the PlanetBids website.
Plans/Specs: Hard Copy Sets Available from SABP Print Solutions 2372 Morse Avenue, Irvine, CA 92614
(949) 756-1001 Contact Kristen at KLD@sabp.com