IRWD Bid for: Michelson Water Recycling Plant Emergency Recycled Water Diversion to San Diego Creek
Project Number:10093
Project Manager: Scott Toland, IRWD, 949-453-5703
Design Engineer: Gregorio Estrada, HDR, 714-730-2391
Bidders: Bids will be accepted for this Project only from the prequalified bidders on the Project Bidders List. Prequalification to be placed on the Project Bidders List for this Project is closed.
Bid Opening Date: Thursday, October 25, 2018, 2:00 P.M.
Location of Opening: Irvine Ranch Water District 15600 Sand Canyon Avenue, Irvine, CA 92618
Description of Project: The project includes, but is not limited to, installation of 24-inch epoxy lined and coated welded steel pipe, isolation valves, flow meter, static mixer, pressure reducing valve, connections to existing plant pipelines at two separate locations, construction and installation of a chemical containment structure, chemical storage tank, bisulfite metering pump system, and associated electrical and instrumentation improvements.
Price for Plans Available from: SABP Print Solutions 2372 Morse Avenue, Irvine, CA 92614 (949) 756-1001 Contacy Kristen- KLD@sabp.com
Time of Performance: 200 consecutive calendar days from date of mailing the Notice of Award
Engineer’s Estimate: $830,000 (Eight Hundred Thirty Thousand Dollars)
Pre-Bid Meeting: A mandatory pre-bid meeting is scheduled for Thursday, September 27,
2018 at 9:00 AM. The meeting will be at the Michelson Water Recycling Plant, 3512 Michelson Drive, CA 92612