Irvine Ranch Water District RFP for Recycled Water Services in Lake Forest
Name of Project: Lake Forest Recycled Water Services on Bake Parkway and Toledo Way
Project Number: PR 07159, Code 7220
Project Manager: Malcolm A. Cortez, P.E.
Project Engineer: Tom Bonkowski
Design Engineer: JIG Consulting
Bidders: Bids will be accepted for this Project only from the prequalified bidders on the Project Bidders List. Prequalification to be placed on the Project Bidders List for this Project is closed.
Bid Opening Date June 28, 2018 at 2:00 p.m.
Location of Opening: Irvine Ranch Water District 15600 Sand Canyon Avenue, Irvine, CA 92618
Description of Project: Construction of three water services (recycled), disconnection and abandonment of six existing water services (potable), excavation, backfilling and compaction of trenches and excavations, and road paving and striping.
Time of Performance: 90 consecutive calendar days from date of mailing the Notice of Award
Engineer’s Estimate: $124,300.00
Pre-Bid Meeting: June 14, 2018 at 8:30 a.m. at the District’s Michelson Water Recycling Plant, Operations Center Committee Room, 3512 Michelson Drive, Irvine CA 92612
Price for Plans/Specs Available from: SABP Print Solutions
2372 Morse Avenue, Irvine, CA 92614
(949) 756-1001 Contact Kristen KLD@sabp.com
IRWD Construction Manual available for free download at www.irwd.com