Skip to main content

Irvine Ranch Water District-Sewer Upsizing RFP

Name of Project: Elderwood Sewer Upsizing
Project Number: PR 10095


Project Manager: Malcolm Cortez, IRWD (949) 453-5854
Senior Engineer:  Harry Cho, IRWD    (949) 453-5675
Project Engineer: Alex Murphy, IRWD (949) 453-5863

Bidders: Bids will be accepted for this Project only from the prequalified bidders on the Project Bidders List. Prequalification to be placed on the Project Bidders List for this Project is closed.
Bid Opening Date:  Thursday, June 14, 2018 at 2:00 pm.

Location of Opening: Irvine Ranch Water District  15600 Sand Canyon Avenue, Irvine, CA 92618

Description of Project: This project will include replacement of approximately 260 feet of 8-inch vitrified clay pipe (VCP) with 10-inch Polyvinyl Chloride (PVC) pipe between existing manholes, and installation of 260 feet of cured in place pipe (CIPP) on an 8-inchVCP sewer pipe on Elderwood street in Lake Forest, CA. The scope will include bypass pumping as necessary to perform the work. The scope of work will also include replacement of frames, covers, and grade rings for three manholes.

Time of Performance: 90 consecutive calendar days from date of mailing the Notice of Award.

Engineer’s Estimate: One hundred nineteen thousand one hundred twenty dollars ($119,120)

Pre-Bid Conference: There will be non-mandatory pre-bid meeting on Wednesday, May 30, 2018 at 9:00 am at IRWD Operations Center, 3512 Michelson Drive, Irvine, CA  92612.

 Plans/Specs:Available at  SABP Print Solutions
2372 Morse Avenue, Irvine, CA 92614 (949) 756-1001
Contact: Kristen KLD@sabp.com

IRWD Construction manual available for free download at www.irwd.com