Skip to main content

IRWD Sewer Rehab Project

Irvine Ranch Water District Sewer Rehab Project

Name of Project: 2017 Sewer Rehabilitation
Project Number: PR 07100

Project Manager: Malcolm Cortez, IRWD (949) 453-5854
Senior Engineer Harry Cho, IRWD (949) 453-5675
Project Engineer: Alex Murphy, IRWD (949) 453-5863
Design Engineer: Maira Salcedo, Psomas (714) 481-8008

Bidders: Bids will be accepted for this Project only from the prequalified bidders on the Project Bidders List. Prequalification to be placed on the Project Bidders List for this Project is closed.

Bid Opening Date: Thursday, September 28, 2017 at 2:00 pm.

Location of Opening: Irvine Ranch Water District  15600 Sand Canyon Avenue, Irvine, CA 92618

Description of Project: This project will rehabilitate approximately 3,800 feet of existing sewer pipe from 8- to 15-inches in diameter at various locations in the cities of Irvine, Newport Beach, and Lake Forest. The scope of work will include cleaning and installation of cure-in-place liners to rehabilitate existing sewer pipes. The contractor will be responsible for providing traffic control and sewer bypassing as required to perform the work. The project will also include approximately 50 feet of open cut replacement of 8-inch vitrified clay sewer pipe.

Time of Performance: 130 consecutive calendar days from date of mailing the Notice of Award.

Engineer’s Estimate: Two hundred twenty-one thousand one hundred fifty dollars ($221,150)

Pre-Bid Conference: There will be non-mandatory pre-bid meeting on Tuesday, September 12, 2017 at 10:00 am at IRWD Operations Center, 3512 Michelson Drive, Irvine, CA 92612.

Plans and Specs available for purchase from:

SABP Reprographics  2372 Morse Avenue, Irvine, CA 92614 (949) 756-1001  KLD@sabp.com