IRWD new RFP-Tustin Legacy Red Hill Well Site Improvements
Project Number:6215 Owner: Irvine Ranch Water District (IRWD) Engineering Department
Project Manager:Malcolm Cortez, 949-453-5854
Project Engineer: Thomas Bonkowski, 949-453-5692
Design Engineer: Safa Kamangar, CivilSource, 949-585-0477
Bidders: Bids will be accepted for this Project only from the prequalified bidders on the Project Bidders List. Prequalification Bidders are listed below
- Pascal & Ludwig Constructors
- Paulus Engineering, Inc.
- R C Foster Corporation
- New Dimension General Construction
- Quickel Paving
- Tropical Plaza Nursey
Bid Opening Date and Time: Thursday, February 25, 2016 at 2:00 p.m.
Location of Opening: Irvine Ranch Water District 15600 Sand Canyon Avenue, Irvine, CA 92618
Description of Project:The work includes demolishing and removing portions of the existing block wall, rooting, and pilasters around the existing well site, removing landscape and portion of irrigation system, grading, and constructing a new block wall and pilaster around the enlarged well site.
Plans/Specs available at: Santa Ana Blue Print (SABP) Reprographics,
2372 Morse Avenue, Irvine, CA 92614 (949) 756-1001 KLD@sabp.com
Time of Performance:80 consecutive calendar days from date of mailing the Notice of Award
Engineer’s Estimate: Sixty-Three Thousand Dollars ($63,000)
Pre-Bid Meeting: A non-mandatory pre-bid meeting will be held on Wednesday, February 17, 2016 at 2:00 p.m. at the IRWD Operations Center, 3512 Michelson Drive, Irvine CA 92612. A site visit to the project area will occur after the meeting.
IRWD Construction Manual available for free download at www.irwd.com