IRWD- ADDENDUM To Chloramine Booster Stations at Foothill Zone 6 and Portola Zone 8 Reservoirs
Project Number: PR 11687 (4409)
ADDENDUM ISSUED TO ADD “R. C. FOSTER CORPORATION” TO THE SELECT BIDDERS LIST
Owner: Irvine Ranch Water District (IRWD) Engineering Department
Project Manager: Malcolm Cortez, (949) 453-5854
Project Engineer: Alex Murphy, IRWD (949) 453-5863
Design Engineer: Joseph Long, AECOM (714) 567-2725
Bidders: Bids will be accepted for this Project only from the prequalified bidders on the Project Bidders List.
- ARB, Inc.
- Clarke Contracting Corp
- Steve P. Rados, Inc.
- J.F. Shea Construction, Inc.
- Archer Western Contractors
- Stanek Constructors
- Gateway Pacific Contractors inc.
- Pascal $ Ludwig Constructors
- Olsson Construction
- Pacific Hydrotech
- SS Mechanical Corp.
- M Lyles Co.
- R C Foster Corporation
Bid Opening Date and Time: Wednesday, February 3, 2016 2:00 PM PST
Location of Opening: Irvine Ranch Water District, 15600 Sand Canyon Avenue, Irvine, CA 92618
Description of Project: This project will construct chloramine booster stations and reservoir mixers at the Foothill Zone 6 and Portola Zone 8 domestic water reservoirs located in Foothill Ranch and Portola Hills.
Time of Performance: 360 consecutive calendar days from date of mailing the Notice of Award
Engineer’s Estimate:One million six hundred sixty-six thousand nine hundred dollars ($1,666,900)
Pre-Bid Meeting: A non-mandatory pre-bid meeting will be held on Tuesday, January 5, 2016 at 10:00 a.m. at IRWD Headquarters, 15600 Sand Canyon Avenue, Irvine, CA 92618.There will be a job walk following the meeting at the construction site.
Plans/Specs Available at: SABP Reprographics,
2372 Morse Avenue, Irvine, CA 92614 (949) 756-1001