Name of Project: Peters Canyon Channel (F06) Water Capture and Reuse Pipeline
Project Number: PR 21163 (4985)
Bid Opening Date: March 12, 2015 at 2:00 PM
Location of Opening: Irvine Ranch Water District
15600 Sand Canyon Avenue, Irvine, CA 92618
Project Manager: Joe McGehee, 949-453-5542
Design Engineer: Tom Epperson, Tetra Tech, 949-809-5156
Pre-Bid Meeting: A mandatory pre-bid conference is scheduled for Wednesday, February 18,
2015 at 10:00 AM.
The meeting will be at 15600 Sand Canyon Avenue, Irvine, CA 92618
Bidders:
Bids will be accepted for this Project only from the prequalified bidders Listed below
ARB Inc
CCL Contracting
E.J. Myers Company
Flatiron Construction Corp.
Leatherwood Construction
Mladen Buntich Construction
Paulus Engineering
Steve Bubalo Construction
Sukut Construction
Sully Miller Contracting
Vido Artukovich & Sons
W.A. Rasic Construction
Description of Project: Construction of the Peters Canyon Channel (F06) Water Capture and Reuse Pipeline including buried piping, jack and bore at Como Channel, wet wells, meter vaults, valve vaults, desilting basin, diversion facilities, paving, concrete, electrical and telemetry equipment, submersible pumps, sampling equipment, and all other appurtenant work.
Plans/Specs Available: