City of Newport Beach- New RFP – Eastbluff Drive Widening

- installation of bike lanes on Eastbluff Drive and Ford Road from Mar Vista Drive to MacArthur Boulevard,
- Widening the south shoulder of Eastbluff Drive from Mar Vista Drive to Jamboree Road,
- Removing concrete sidewalk, curb and gutter, slough wall, curb access ramps, street trees, striping, clearing and grubbing the existing site,
- Grading,
- Constructing sidewalk, curb access ramps, curb and gutters, asphalt concrete pavement, slough wall, traffic striping,
- Relocating streetlights, signage, pull boxes, water meters, installing street trees, modifying existing traffic signal, and providing traffic control.