Skip to main content

Corona Del Mar Library & Fire Station Project

Corona Del Mar Library & Fire Station Project The existing Corona Del Mar Fire Station No. 5 and the Corona Del Mar Branch Library went into service separately approximately sixty years ago. Both of these buildings have exceeded their intended service life and need to be replaced. old-libray Library Now old-f   Fire Station Now   The Project Team (City staff and WLC Architects (WLC)) met with the Community numerous times over the past several months to fine-tune the numerous conceptual designs. Upon selecting a final design by the Library Board of Trustees and obtaining approval from the City Council earlier this year, WLC has been busy preparing the final construction plans and contract documents. proposed     Proposed    The Fire Station Crew/Operations relocation to the City parking lot at the northwest corner of 5th Avenue and Marguerite Avenue (across the street from the OASIS Community Center) and the start of substantial construction will likely begin in early 2017, for a 12-14 months construction period. WLC Architects, Library and Public Works staff (the Design Team) are continuing to work on preliminary layouts and have generated several different layouts for consideration.  The D-series options are receiving the most favorable responses from the Board and the community.  However, a preferred layout has not been approved at this time.  WLC is also developing exterior rendering concepts, with an emphasis of incorporating a balanced neighborhood architectural theme into the building façade.]]>